Skip to the main content Skip to the instrument panel
0 Help Sign inCreate an account
Weather and agronomy
Air temperature 11 °C
Feels like 9 °C
Conditions Light cloud
Rain today 2.4 mm
Rain last 7 days 18.6 mm
Season to date 412 mm
Wind speed 9 mph
Wind direction WSW
Gusting 17 mph
Humidity 78 %
Pressure 1014 hPa
Delta T 3.1 Evaporative potential during spraying. Outside 2 to 8 the application window is compromised.
UV index 2
Next 24 hours
Five day outlook
Field conditions
Soil temperature at 10cm 8.4 °C
Soil moisture deficit 26 mm
Growing degree days 742 GDD
Frost risk tonight Low
Spray window Open Combines wind speed, Delta T, temperature and rainfall forecast against label conditions.
Travelling conditions Marginal
Workable days this month 11 days
Blight risk Low
Grass growth rate 38 kg DM/ha/day
Latest satellite pass 2 days ago
Time and season
Time
Date
Sunrise
Sunset
Day length
Moon phase
Season
Week
To harvest
Markets and prices
Feed wheat 184.50 £/t
Feed barley 168.00 £/t
Oilseed rape 412.00 £/t
Farmgate milk 43.20 p/l
Deadweight beef 612 p/kg
Deadweight lamb 698 p/kg
Deadweight pig 214 p/kg
Ammonium nitrate 378 £/t
Red diesel 72.4 p/l
Electricity 25.8 p/kWh
Woodland carbon unit 28.32 £
Biodiversity unit 25,000 £
Schemes and deadlines
Open scheme windows 3
Budget allocated 52 % How much of the current scheme budget has been committed. Published at 25, 50 and 75 per cent.
Next deadline 15 May
Claim status In progress
Payments due 18,420 £
Compliance score 86 %

Instrument values are sample data until your holding is connected to a live source. How the data connections work

Irrigation, Reservoirs & Scheduling

Irrigation: For Farmers

What Irrigation changes for the person actually doing the work.

For the person running the business, the test of any farm software is whether it removes work or adds it. Irrigation scheduling based on soil moisture deficit and evapotranspiration rather than habit typically delivers substantial water and energy savings alongside better crop uniformity. This module runs the scheduling model, manages reservoir storage and refill, and appraises the capital case for winter storage against a summer abstraction licence that may not always be available.

In their words

What the job actually looks like

These are not marketing personas. Each one is a distinct job with a distinct constraint, and the module is designed so that solving one does not create work for the others.

01

Potato grower

Irrigated on light land

Needs scheduling that protects tuber quality without wasting licence volume.

  1. Establish soil water holding capacity by field
  2. Install and calibrate monitoring
  3. Model the deficit daily
  4. Plan irrigation against licence headroom
02

Salad producer

High-frequency irrigation

Needs uniformity and energy cost under control.

  1. Install and calibrate monitoring
  2. Model the deficit daily
  3. Plan irrigation against licence headroom
  4. Apply and record volumes
03

Farm engineer

Reservoir project

Needs a capital appraisal with grant funding modelled.

  1. Model the deficit daily
  2. Plan irrigation against licence headroom
  3. Apply and record volumes
  4. Monitor uniformity and energy use

End to end

How Irrigation runs, start to finish

The module is modelled as a state machine, so at any point the business knows exactly which stage every record is at and what has to happen next.

  1. 1

    Establish soil water holding capacity by field

    This is where the record starts, and getting it right here removes work at every later stage.

  2. 2

    Install and calibrate monitoring

    The platform prompts only for what this stage genuinely needs, and carries everything forward.

  3. 3

    Model the deficit daily

    Conflicts with scheme rules, regulatory windows and existing commitments are flagged here rather than discovered later.

  4. 4

    Plan irrigation against licence headroom

    Capture works offline, so this stage is completed in the field rather than remembered afterwards.

  5. 5

    Apply and record volumes

    Everything recorded at this point becomes evidence automatically, in every format that will later ask for it.

  6. 6

    Monitor uniformity and energy use

    This is the stage most businesses currently do twice, once for the operation and once for the paperwork.

  7. 7

    Manage reservoir refill through winter

    Results feed the whole-farm view, so the effect of this stage is visible against the rest of the business.

  8. 8

    Review seasonal efficiency and yield response

    The cycle closes here, and what is learned is carried into next season's plan rather than lost.

Capabilities

What Irrigation does

Every capability below is built on the same underlying record, so entering something once is enough for it to appear wherever it is needed.

Record and plan

  • Soil moisture deficit modelling by field, soil type and crop stage
  • Evapotranspiration-based scheduling with local weather input
  • Soil moisture sensor integration with calibration to field capacity

Operate and monitor

  • Irrigation event planning, execution and recording
  • Application uniformity assessment for booms, guns and drip
  • Reservoir storage volume, refill and drawdown management

Comply and evidence

  • Reservoir design appraisal with capital cost and grant modelling
  • Reservoir safety and inspection compliance record
  • Energy use per cubic metre pumped with cost tracking

Analyse and improve

  • Fertigation programme integration with the nutrient plan
  • Crop water requirement and critical stage identification
  • Deficit irrigation strategy modelling when water is limited

Obligation calendar

What irrigation asks of you, and when

Windows, deadlines and recurring obligations for England. Set a different nation and the calendar reconfigures; farm across a border and it shows both, reconciled.

  • Scheme window or deadline
  • Recurring farm obligation
  • Statutory return
  1. February 1 entry

  2. March 1 entry

    • 3 March: Plan irrigation against licence headroom

      A recurring step in irrigation.

  3. April 1 entry

  4. May 1 entry

    • 9 May: Install and calibrate monitoring

      A recurring step in irrigation.

  5. June 2 entries

  6. July 3 entries

    • 10 July: Model the deficit daily

      A recurring step in irrigation.

    • 14 July: Slurry Infrastructure Grant

      Round-based.

      Defra / Rural Payments Agency england

    • 17 July: Water Management Grant

      Round-based.

      Defra / Rural Payments Agency england

  7. August 1 entry

    • 12 August: Establish soil water holding capacity by field

      A recurring step in irrigation.

  8. October 1 entry

  9. November 2 entries

  10. December 1 entry

    • 26 December: Countryside Stewardship

      Rolling and round-based depending on the tier and option group.

      Defra / Natural England / Rural Payments Agency england

Windows move, and sometimes at short notice. Every entry links to the publishing body so you can confirm the current date before you rely on it.

Worked example

How a business like yours would use Irrigation

Potato growerIrrigated on light land
Worked example

The problem: Needs scheduling that protects tuber quality without wasting licence volume.

What they do

  1. Establish soil water holding capacity by field
  2. Install and calibrate monitoring
  3. Model the deficit daily
  4. Plan irrigation against licence headroom

What changes

  • Water applied per hectare
  • Water use efficiency per tonne
  • Energy cost per cubic metre

This is an illustrative worked example built from the module design, not a customer reference. Named case studies are published only with the business's written consent.

What we are hearing

The problems people describe to us

These are composite statements drawn from user research conversations, not attributed customer quotes. We publish named references only with written consent.

I am not short of software. I am short of one place where the same field means the same thing in all of it.

Arable farm managerEast of England

The scheme closed on a Tuesday evening. I had the application half built. Nobody told me the budget was nearly gone.

Mixed farmerMidlands

We farm on both sides of the border. Everything takes twice as long and I still cannot see the whole position on one screen.

Livestock producerWelsh border

Audit week costs me three days. Every single record they ask for is already written down somewhere on this farm.

Dairy farmerSouth West

Measurement

How you will know it is working

The module reports against these measures from the day it is switched on, so the value is demonstrable rather than assumed.

  • 01Water applied per hectare
  • 02Water use efficiency per tonne
  • 03Energy cost per cubic metre
  • 04Application uniformity coefficient
  • 05Reservoir utilisation

Free tool

Run the numbers for your own holding

Enter your figures and get an answer you can act on, with the method shown so you can check it. Save the result to your account or take it away as a PDF.

Next deadlines
15 May Single application form — Wales and Northern Ireland Window 2 open Sustainable Farming Incentive — England, 52% allocated Ongoing Capital grants — allocation moves fast once open Annual Whole Farm Plan components — Scotland, phased deadlines 6 April Inheritance relief cap takes effect — UK wide