Skip to the main content Skip to the instrument panel
0 Help Sign inCreate an account
Weather and agronomy
Air temperature 11 °C
Feels like 9 °C
Conditions Light cloud
Rain today 2.4 mm
Rain last 7 days 18.6 mm
Season to date 412 mm
Wind speed 9 mph
Wind direction WSW
Gusting 17 mph
Humidity 78 %
Pressure 1014 hPa
Delta T 3.1 Evaporative potential during spraying. Outside 2 to 8 the application window is compromised.
UV index 2
Next 24 hours
Five day outlook
Field conditions
Soil temperature at 10cm 8.4 °C
Soil moisture deficit 26 mm
Growing degree days 742 GDD
Frost risk tonight Low
Spray window Open Combines wind speed, Delta T, temperature and rainfall forecast against label conditions.
Travelling conditions Marginal
Workable days this month 11 days
Blight risk Low
Grass growth rate 38 kg DM/ha/day
Latest satellite pass 2 days ago
Time and season
Time
Date
Sunrise
Sunset
Day length
Moon phase
Season
Week
To harvest
Markets and prices
Feed wheat 184.50 £/t
Feed barley 168.00 £/t
Oilseed rape 412.00 £/t
Farmgate milk 43.20 p/l
Deadweight beef 612 p/kg
Deadweight lamb 698 p/kg
Deadweight pig 214 p/kg
Ammonium nitrate 378 £/t
Red diesel 72.4 p/l
Electricity 25.8 p/kWh
Woodland carbon unit 28.32 £
Biodiversity unit 25,000 £
Schemes and deadlines
Open scheme windows 3
Budget allocated 52 % How much of the current scheme budget has been committed. Published at 25, 50 and 75 per cent.
Next deadline 15 May
Claim status In progress
Payments due 18,420 £
Compliance score 86 %

Instrument values are sample data until your holding is connected to a live source. How the data connections work

Water & Rainwater

Drainage, Flood Risk & Natural Flood Management

Get water off the field, and slow it down before it reaches the village.

Field drainage determines workable days, yield stability and machinery damage, and it is almost always undocumented — the plans are in a drawer or lost. This module maps the drainage system, plans maintenance and renewal, assesses flood risk to land and buildings, and appraises natural flood management interventions that now attract funding in their own right.

  • 12 capabilities
  • 4 linked schemes
  • Offline capable
12
Capabilities in this module
5
Interactive tools
4
Linked support schemes
5
Data integrations
5
Measures reported

The ground reality

What is actually happening in drainage & flood in the UK

Substantial capital has been committed to flood defence, and natural flood management is increasingly funded as a catchment intervention rather than an incidental benefit. Much of the UK's field drainage was installed decades ago with no surviving record, so the first task on most holdings is finding out what is actually there.

Figures are as published at the time of writing. Farm policy and payment rates change frequently — verify against the primary source before relying on any number here.

In the field

Drainage & flood, as it actually looks

Photography from working UK holdings alongside the interface that records it. Every frame below is a commissioned slot: the brief is stated until the photograph is taken.

Drainage & Flood — a walkthrough

A working pass through drainage & flood: entering the record once, and watching it appear in the evidence pack, the calendar and the scheme application without being typed again.

Film in production

Captions · Audio described

  1. 0:00 What the module is for
  2. 0:48 Entering the record
  3. 2:05 Where it appears next
  4. 3:20 The evidence pack

Photography slots state their own brief until the shot is commissioned, so the layout never shifts when real images arrive.

Capabilities

What Drainage & Flood does

Every capability below is built on the same underlying record, so entering something once is enough for it to appear wherever it is needed.

Record and plan

  • Drainage system mapping including mains, laterals, outfalls and manholes
  • Historic drainage plan digitisation and georeferencing
  • Drainage performance assessment by field with wet spot identification

Operate and monitor

  • Maintenance schedule for jetting, outfall clearing and ditch management
  • Drainage renewal appraisal with cost and yield benefit modelling
  • Mole ploughing and subsoiling planning against soil condition

Comply and evidence

  • Flood risk assessment for land, buildings and access
  • Flood warning subscription and response planning
  • Natural flood management intervention design — leaky dams, bunds, ponds and buffer planting

Analyse and improve

  • Runoff and attenuation modelling for catchment contribution
  • Watercourse and ditch riparian responsibility recording
  • Internal Drainage Board liability and rate record

Interactive

Tools you actually use, not screens you read

These are working interfaces inside the module — maps, calculators, planners and dashboards that respond to your own holding data.

Drainage map with performance overlay and wet spot marking

Drainage map with performance overlay and wet spot marking

Map

Drainage renewal payback calculator using workable days and yield uplift

Drainage renewal payback calculator using workable days and yield uplift

Calculator

Flood risk map for the holding with warning zone overlay

Flood risk map for the holding with warning zone overlay

Map

Natural flood management siting tool using terrain and flow accumulation

Natural flood management siting tool using terrain and flow accumulation

Tool

Ditch and watercourse maintenance schedule generator

Ditch and watercourse maintenance schedule generator

Tool

End to end

How Drainage & Flood runs, start to finish

The module is modelled as a state machine, so at any point the business knows exactly which stage every record is at and what has to happen next.

  1. 1

    Locate and map the existing system

    This is where the record starts, and getting it right here removes work at every later stage.

  2. 2

    Assess performance field by field

    The platform prompts only for what this stage genuinely needs, and carries everything forward.

  3. 3

    Prioritise maintenance and renewal

    Conflicts with scheme rules, regulatory windows and existing commitments are flagged here rather than discovered later.

  4. 4

    Appraise the investment case

    Capture works offline, so this stage is completed in the field rather than remembered afterwards.

  5. 5

    Assess flood risk and set up warnings

    Everything recorded at this point becomes evidence automatically, in every format that will later ask for it.

  6. 6

    Design natural flood management where funded

    This is the stage most businesses currently do twice, once for the operation and once for the paperwork.

  7. 7

    Deliver and record works

    Results feed the whole-farm view, so the effect of this stage is visible against the rest of the business.

  8. 8

    Monitor performance and workable days

    The cycle closes here, and what is learned is carried into next season's plan rather than lost.

Who uses it

Built around four real jobs, not one generic user

Each of these people needs something different from the same record. The module is designed so none of them has to work around the others.

Heavy land farmer

Workability constrained

Needs to know where the drains actually are before spending on renewal.

Floodplain farmer

Regular inundation

Needs warning, response planning and a funded alternative land use.

Drainage contractor

Installation and maintenance

Needs an accurate existing-system map to work from.

Catchment partnership

Natural flood management

Needs coordinated intervention siting across multiple holdings.

Measurement

How you will know it is working

The module reports against these measures from the day it is switched on, so the value is demonstrable rather than assumed.

  • 01Drainage system mapped
  • 02Workable days gained
  • 03Wet spots resolved
  • 04Flood events with an executed response plan
  • 05NFM storage volume created

Obligation calendar

What drainage & flood asks of you, and when

Windows, deadlines and recurring obligations for England. Set a different nation and the calendar reconfigures; farm across a border and it shows both, reconciled.

  • Scheme window or deadline
  • Recurring farm obligation
  • Statutory return
  1. February 1 entry

  2. April 2 entries

    • 12 April: Appraise the investment case

      A recurring step in drainage & flood.

    • 20 April: Adding Value Grant

      Round-based.

      Defra / Rural Payments Agency england

  3. June 4 entries

    • 5 June: Farming Transformation Fund

      Round-based by theme.

      Defra / Rural Payments Agency england

    • 15 June: Sustainable Farming Incentive 2026

      Two windows in 2026: window one from 30 June, window two from September.

      Defra / Rural Payments Agency england

    • 17 June: Locate and map the existing system

      A recurring step in drainage & flood.

    • 18 June: Prioritise maintenance and renewal

      A recurring step in drainage & flood.

  4. July 2 entries

  5. October 1 entry

  6. November 3 entries

  7. December 1 entry

    • 26 December: Countryside Stewardship

      Rolling and round-based depending on the tier and option group.

      Defra / Natural England / Rural Payments Agency england

Windows move, and sometimes at short notice. Every entry links to the publishing body so you can confirm the current date before you rely on it.

Payment schedule

What is due, and when it lands

Farm support arrives in instalments from several bodies on different calendars. Set against your own overdraft, the question is not how much but when — so the ledger is ordered by date, not by scheme.

Sample
Scheduled and expected scheme payments, in date order
When Payment From Amount Status
March Countryside Stewardship Defra / Natural England / Rural Payments Agency Expected
June Environmental Land Management Capital Grants Defra / Rural Payments Agency Agreed
June Water Management Grant Defra / Rural Payments Agency Eligible
June Sustainable Farming Incentive 2026 Defra / Rural Payments Agency Eligible
December Farming Equipment and Technology Fund Defra / Rural Payments Agency Eligible
February Farming Transformation Fund Defra / Rural Payments Agency Eligible
  • Agreed and scheduled
  • Claimed, awaiting payment
  • Eligible, unclaimed

What the statuses mean

Agreed
Under a signed agreement with a scheduled payment date.
Expected
Claimed and assessed; payment date per the published standard.
Eligible
Your holding appears to qualify but nothing is claimed yet.

Amounts are blank because they depend on your own holding, your agreements and current payment rates. Rates change during a scheme year, so the ledger always shows the rate it used and the date it read it.

Sample

Questions answered

What people ask about Drainage & Flood

Does this replace the software I already use?

Not necessarily. Agrivencia integrates with authoritative sources and mainstream packages rather than insisting on replacing them. Where an incumbent does one job well, the platform connects to it; where the job spans several systems and nobody does it, the platform does it.

Will it work where I have no signal?

Yes. Field capture in Drainage & Flood is offline first, storing locally and synchronising when a connection returns. Only around a fifth of UK farms report reliable signal across the whole holding, so this is a design assumption rather than a feature.

What happens when the scheme rules change?

Scheme rules are held as data rather than code, so a rate change, a cap change or a window closure is a content update that takes effect the same day. The platform also alerts you to what the change does to your own position.

Who owns the data I put in?

You do. The Farm Data Charter gives you a complete export in open formats at any time, and every instance of data sharing requires an explicit, revocable consent that is visible in your account.

Does it work if I farm across a border?

Yes, and that is one of the main reasons the platform exists. A business with land in more than one nation sees one reconciled view rather than two portals, with obligations and deadlines from both administrations in a single calendar.

Can my agronomist or land agent use it too?

Yes. You grant scoped, time-limited access per holding and per module, and you can revoke it in one click. Advisers never get a shared password or a blanket view.

What is the biggest limitation of this module?

Damaging unmapped drains during operations. Mitigated by mapping first. We would rather state that plainly than let you discover it after signing.

Documents

Take it away with you

Everything here is printable and works on a kitchen table with no signal. Where a document asks for an email address, it says so on the button rather than after you press it.

Handbook

Finding the Drains: Mapping, Maintaining and Renewing Field Drainage

PDF · UK · updated on scheme change

The practical handbook for drainage & flood: what the rules require, what the evidence has to show, and the mistakes that cost people money.

Checklist

drainage & flood — evidence checklist

PDF · one page · printable

Every document an audit or a claim asks for, in the order it is asked for, with the validity period of each.

Template

drainage & flood — record template

XLSX and CSV

The record structure the module uses, as a spreadsheet, so a business not yet on the platform can start keeping it correctly today.

Reference

Data model reference

PDF · technical

Entities, fields and integration points for drainage & flood, for advisers and software partners.

Documents are versioned and dated. When a scheme rule changes, the affected document is reissued and anyone who downloaded it is told what changed.

See Drainage & Flood running on your own holding

Thirty minutes, using your parcels, your schemes and your enterprises rather than a sample farm. No obligation and no sales script — if it does not fit your business we will say so.

  • Free tier available
  • No card required
  • Your data stays yours
Next deadlines
15 May Single application form — Wales and Northern Ireland Window 2 open Sustainable Farming Incentive — England, 52% allocated Ongoing Capital grants — allocation moves fast once open Annual Whole Farm Plan components — Scotland, phased deadlines 6 April Inheritance relief cap takes effect — UK wide