Skip to the main content Skip to the instrument panel
0 Help Book a demo
Weather and agronomy
Air temperature 11 °C
Feels like 9 °C
Conditions Light cloud
Rain today 2.4 mm
Rain last 7 days 18.6 mm
Season to date 412 mm
Wind speed 9 mph
Wind direction WSW
Gusting 17 mph
Humidity 78 %
Pressure 1014 hPa
Delta T 3.1 Evaporative potential during spraying. Outside 2 to 8 the application window is compromised.
UV index 2
Next 24 hours
Five day outlook
Field conditions
Soil temperature at 10cm 8.4 °C
Soil moisture deficit 26 mm
Growing degree days 742 GDD
Frost risk tonight Low
Spray window Open Combines wind speed, Delta T, temperature and rainfall forecast against label conditions.
Travelling conditions Marginal
Workable days this month 11 days
Blight risk Low
Grass growth rate 38 kg DM/ha/day
Latest satellite pass 2 days ago
Time and season
Time
Date
Sunrise
Sunset
Day length
Moon phase
Season
Week
To harvest
Markets and prices
Feed wheat 184.50 £/t
Feed barley 168.00 £/t
Oilseed rape 412.00 £/t
Farmgate milk 43.20 p/l
Deadweight beef 612 p/kg
Deadweight lamb 698 p/kg
Deadweight pig 214 p/kg
Ammonium nitrate 378 £/t
Red diesel 72.4 p/l
Electricity 25.8 p/kWh
Woodland carbon unit 28.32 £
Biodiversity unit 25,000 £
Schemes and deadlines
Open scheme windows 3
Budget allocated 52 % How much of the current scheme budget has been committed. Published at 25, 50 and 75 per cent.
Next deadline 15 May
Claim status In progress
Payments due 18,420 £
Compliance score 86 %

Instrument values are sample data until your holding is connected to a live source. How the data connections work

Climate, Nature & Carbon

Climate Risk & Adaptation

Plan for the weather you will get, not the weather you remember.

Adaptation planning is the discipline of deciding, in advance, what the business will do when conditions fall outside the historic range. This module assesses physical climate risk to the specific holding, models the effect on cropping and livestock systems, and builds costed contingency plans with defined trigger points.

  • 12 capabilities
  • 4 linked schemes
  • Offline capable
12
Capabilities in this module
5
Interactive tools
4
Linked support schemes
5
Data integrations
5
Measures reported

The ground reality

What is actually happening in climate adaptation in the UK

Recent seasons have produced both a difficult harvest with sharply reduced cereal production and rapid swings back to volatility within months. Weather risk now expresses itself as yield swings exceeding twenty per cent, which is larger than most efficiency gains available elsewhere in the business, making adaptation an economic rather than an environmental exercise.

Figures are as published at the time of writing. Farm policy and payment rates change frequently — verify against the primary source before relying on any number here.

In the field

Climate adaptation, as it actually looks

Photography from working UK holdings alongside the interface that records it. Every frame below is a commissioned slot: the brief is stated until the photograph is taken.

Climate Adaptation — a walkthrough

A working pass through climate adaptation: entering the record once, and watching it appear in the evidence pack, the calendar and the scheme application without being typed again.

Film in production

Captions · Audio described

  1. 0:00 What the module is for
  2. 0:48 Entering the record
  3. 2:05 Where it appears next
  4. 3:20 The evidence pack

Photography slots state their own brief until the shot is commissioned, so the layout never shifts when real images arrive.

Capabilities

What Climate Adaptation does

Every capability below is built on the same underlying record, so entering something once is enough for it to appear wherever it is needed.

Record and plan

  • Physical climate risk assessment for the holding location
  • Historic weather series analysis with trend and extreme event frequency
  • Drought, flood, heat and waterlogging exposure mapping by field

Operate and monitor

  • Cropping system resilience assessment against projected conditions
  • Livestock heat stress and housing adaptation planning
  • Contingency plan authoring with defined trigger thresholds

Comply and evidence

  • Water security planning linked to the abstraction and storage modules
  • Variety and species diversification for risk spreading
  • Insurance and risk transfer option appraisal

Analyse and improve

  • Business interruption modelling for extreme events
  • Workable days analysis under changing conditions
  • Adaptation investment prioritisation by risk reduction per pound

Interactive

Tools you actually use, not screens you read

These are working interfaces inside the module — maps, calculators, planners and dashboards that respond to your own holding data.

Climate risk dashboard for the holding with exposure by hazard

Climate risk dashboard for the holding with exposure by hazard

Dashboard

Contingency plan builder with trigger thresholds and named actions

Contingency plan builder with trigger thresholds and named actions

Builder

Yield volatility model showing exposure by enterprise

Yield volatility model showing exposure by enterprise

Tool

Workable days projection against historic baseline

Workable days projection against historic baseline

Tool

Adaptation investment ranker by risk reduction per pound spent

Adaptation investment ranker by risk reduction per pound spent

Tool

End to end

How Climate Adaptation runs, start to finish

The module is modelled as a state machine, so at any point the business knows exactly which stage every record is at and what has to happen next.

  1. 1

    Assess hazard exposure for the holding

    This is where the record starts, and getting it right here removes work at every later stage.

  2. 2

    Analyse historic weather and trend

    The platform prompts only for what this stage genuinely needs, and carries everything forward.

  3. 3

    Model the effect on each enterprise

    Conflicts with scheme rules, regulatory windows and existing commitments are flagged here rather than discovered later.

  4. 4

    Identify the critical vulnerabilities

    Capture works offline, so this stage is completed in the field rather than remembered afterwards.

  5. 5

    Set trigger thresholds and contingency actions

    Everything recorded at this point becomes evidence automatically, in every format that will later ask for it.

  6. 6

    Cost and prioritise adaptation investment

    This is the stage most businesses currently do twice, once for the operation and once for the paperwork.

  7. 7

    Rehearse the plan before it is needed

    Results feed the whole-farm view, so the effect of this stage is visible against the rest of the business.

  8. 8

    Review after every significant event

    The cycle closes here, and what is learned is carried into next season's plan rather than lost.

Who uses it

Built around four real jobs, not one generic user

Each of these people needs something different from the same record. The module is designed so none of them has to work around the others.

Farm business owner

Long-term planning

Needs to know which investments actually reduce exposure.

Arable manager

Wet autumn drilling

Needs a decision rule for when to abandon the drilling plan.

Livestock farmer

Summer drought

Needs forage contingency triggered early rather than late.

Agricultural lender

Credit assessment

Needs climate exposure reflected in business resilience.

Measurement

How you will know it is working

The module reports against these measures from the day it is switched on, so the value is demonstrable rather than assumed.

  • 01Yield volatility by enterprise
  • 02Contingency plans with defined triggers
  • 03Adaptation investment made
  • 04Business interruption days
  • 05Workable days achieved

Payment schedule

What is due, and when it lands

Farm support arrives in instalments from several bodies on different calendars. Set against your own overdraft, the question is not how much but when — so the ledger is ordered by date, not by scheme.

Sample
Scheduled and expected scheme payments, in date order
When Payment From Amount Status
June Sustainable Farming Incentive 2026 Defra / Rural Payments Agency Expected
June Water Management Grant Defra / Rural Payments Agency Agreed
February Farming Transformation Fund Defra / Rural Payments Agency Eligible
March Countryside Stewardship Defra / Natural England / Rural Payments Agency Eligible
June Environmental Land Management Capital Grants Defra / Rural Payments Agency Eligible
December Farming Equipment and Technology Fund Defra / Rural Payments Agency Eligible
  • Agreed and scheduled
  • Claimed, awaiting payment
  • Eligible, unclaimed

What the statuses mean

Agreed
Under a signed agreement with a scheduled payment date.
Expected
Claimed and assessed; payment date per the published standard.
Eligible
Your holding appears to qualify but nothing is claimed yet.

Amounts are blank because they depend on your own holding, your agreements and current payment rates. Rates change during a scheme year, so the ledger always shows the rate it used and the date it read it.

Sample

Benchmarking

How this compares with businesses like yours

A cohort is only useful if it is genuinely comparable, so it is built from farm type, soil grade, region and scale rather than from whoever happens to have signed up. Your own figure is never shown to anyone else.

Sample
  • Yield volatility by enterprise

    Lower quartile 31 Median 61 Upper quartile 70

  • Contingency plans with defined triggers

    Lower quartile 23 Median 62 Upper quartile 70

  • Adaptation investment made

    Lower quartile 35 Median 47 Upper quartile 76

  • Business interruption days

    Lower quartile 38 Median 57 Upper quartile 80

  • Workable days achieved

    Lower quartile 23 Median 46 Upper quartile 82

How the cohort is built

Farm type
Matched
Soil grade
Matched
Region
Matched
Scale band
Matched
Cohort size
Minimum 12 businesses, or no comparison is shown

Quartiles are illustrative until a cohort exists. A comparison is suppressed entirely below twelve businesses, because with fewer than that a farmer can work out whose figures they are looking at.

Sample

Questions answered

What people ask about Climate Adaptation

Does this replace the software I already use?

Not necessarily. Agrivencia integrates with authoritative sources and mainstream packages rather than insisting on replacing them. Where an incumbent does one job well, the platform connects to it; where the job spans several systems and nobody does it, the platform does it.

Will it work where I have no signal?

Yes. Field capture in Climate Adaptation is offline first, storing locally and synchronising when a connection returns. Only around a fifth of UK farms report reliable signal across the whole holding, so this is a design assumption rather than a feature.

What happens when the scheme rules change?

Scheme rules are held as data rather than code, so a rate change, a cap change or a window closure is a content update that takes effect the same day. The platform also alerts you to what the change does to your own position.

Who owns the data I put in?

You do. The Farm Data Charter gives you a complete export in open formats at any time, and every instance of data sharing requires an explicit, revocable consent that is visible in your account.

Does it work if I farm across a border?

Yes, and that is one of the main reasons the platform exists. A business with land in more than one nation sees one reconciled view rather than two portals, with obligations and deadlines from both administrations in a single calendar.

Can my agronomist or land agent use it too?

Yes. You grant scoped, time-limited access per holding and per module, and you can revoke it in one click. Advisers never get a shared password or a blanket view.

What is the biggest limitation of this module?

Planning on projections rather than exposure. Mitigated by using measured historic extremes as the primary input. We would rather state that plainly than let you discover it after signing.

Documents

Take it away with you

Everything here is printable and works on a kitchen table with no signal. Where a document asks for an email address, it says so on the button rather than after you press it.

Handbook

Trigger Points and Contingency: Practical Climate Adaptation Planning

PDF · UK · updated on scheme change

The practical handbook for climate adaptation: what the rules require, what the evidence has to show, and the mistakes that cost people money.

Checklist

climate adaptation — evidence checklist

PDF · one page · printable

Every document an audit or a claim asks for, in the order it is asked for, with the validity period of each.

Template

climate adaptation — record template

XLSX and CSV

The record structure the module uses, as a spreadsheet, so a business not yet on the platform can start keeping it correctly today.

Reference

Data model reference

PDF · technical

Entities, fields and integration points for climate adaptation, for advisers and software partners.

Documents are versioned and dated. When a scheme rule changes, the affected document is reissued and anyone who downloaded it is told what changed.

See Climate Adaptation running on your own holding

Thirty minutes, using your parcels, your schemes and your enterprises rather than a sample farm. No obligation and no sales script — if it does not fit your business we will say so.

  • Free tier available
  • No card required
  • Your data stays yours
Next deadlines
15 May Single application form — Wales and Northern Ireland Window 2 open Sustainable Farming Incentive — England, 52% allocated Ongoing Capital grants — allocation moves fast once open Annual Whole Farm Plan components — Scotland, phased deadlines 6 April Inheritance relief cap takes effect — UK wide