Skip to the main content Skip to the instrument panel
0 Help Sign inCreate an account
Weather and agronomy
Air temperature 11 °C
Feels like 9 °C
Conditions Light cloud
Rain today 2.4 mm
Rain last 7 days 18.6 mm
Season to date 412 mm
Wind speed 9 mph
Wind direction WSW
Gusting 17 mph
Humidity 78 %
Pressure 1014 hPa
Delta T 3.1 Evaporative potential during spraying. Outside 2 to 8 the application window is compromised.
UV index 2
Next 24 hours
Five day outlook
Field conditions
Soil temperature at 10cm 8.4 °C
Soil moisture deficit 26 mm
Growing degree days 742 GDD
Frost risk tonight Low
Spray window Open Combines wind speed, Delta T, temperature and rainfall forecast against label conditions.
Travelling conditions Marginal
Workable days this month 11 days
Blight risk Low
Grass growth rate 38 kg DM/ha/day
Latest satellite pass 2 days ago
Time and season
Time
Date
Sunrise
Sunset
Day length
Moon phase
Season
Week
To harvest
Markets and prices
Feed wheat 184.50 £/t
Feed barley 168.00 £/t
Oilseed rape 412.00 £/t
Farmgate milk 43.20 p/l
Deadweight beef 612 p/kg
Deadweight lamb 698 p/kg
Deadweight pig 214 p/kg
Ammonium nitrate 378 £/t
Red diesel 72.4 p/l
Electricity 25.8 p/kWh
Woodland carbon unit 28.32 £
Biodiversity unit 25,000 £
Schemes and deadlines
Open scheme windows 3
Budget allocated 52 % How much of the current scheme budget has been committed. Published at 25, 50 and 75 per cent.
Next deadline 15 May
Claim status In progress
Payments due 18,420 £
Compliance score 86 %

Instrument values are sample data until your holding is connected to a live source. How the data connections work

Supply Chain & Post-Harvest

Assurance Schemes & Audit Preparation

The audit pack assembles itself from work you already recorded.

Assurance paperwork is one of the most consistently cited farmer burdens, and almost all of it duplicates records already created during normal operations. This module maps every scheme standard to the underlying platform record and assembles the audit pack automatically, then runs a gap analysis before the auditor arrives rather than after.

  • 12 capabilities
  • 2 linked schemes
  • Flagship module
  • Offline capable
12
Capabilities in this module
5
Interactive tools
2
Linked support schemes
5
Data integrations
5
Measures reported

The ground reality

What is actually happening in assurance & audit in the UK

Assurance is dominated by a small number of schemes conducting tens of thousands of assessments a year, and standards are periodically revised with defined implementation dates. Duplication across schemes is substantial: the same spray record, medicine book and movement record satisfies requirements in several standards, yet is typically presented separately for each.

Figures are as published at the time of writing. Farm policy and payment rates change frequently — verify against the primary source before relying on any number here.

In the field

Assurance & audit, as it actually looks

Photography from working UK holdings alongside the interface that records it. Every frame below is a commissioned slot: the brief is stated until the photograph is taken.

Assurance & Audit — a walkthrough

A working pass through assurance & audit: entering the record once, and watching it appear in the evidence pack, the calendar and the scheme application without being typed again.

Film in production

Captions · Audio described

  1. 0:00 What the module is for
  2. 0:48 Entering the record
  3. 2:05 Where it appears next
  4. 3:20 The evidence pack

Photography slots state their own brief until the shot is commissioned, so the layout never shifts when real images arrive.

Capabilities

What Assurance & Audit does

Every capability below is built on the same underlying record, so entering something once is enough for it to appear wherever it is needed.

Record and plan

  • Standard library mapping every clause to a platform data source
  • Multi-scheme support so one record satisfies several standards
  • Automatic audit pack assembly from operational records

Operate and monitor

  • Pre-audit gap analysis identifying missing evidence before the visit
  • Non-conformance recording, corrective action and close-out tracking
  • Unannounced audit readiness scoring maintained continuously

Comply and evidence

  • Standard version management with implementation date tracking
  • Certification status and expiry monitoring across schemes
  • Document control for policies, procedures and training records

Analyse and improve

  • Staff training and competence records against standard requirements
  • Internal audit scheduling and recording
  • Historic audit history with trend analysis across cycles

Interactive

Tools you actually use, not screens you read

These are working interfaces inside the module — maps, calculators, planners and dashboards that respond to your own holding data.

Audit readiness score updating continuously as records are created

Audit readiness score updating continuously as records are created

Tool

Gap analysis report listing exactly what is missing and where to get it

Gap analysis report listing exactly what is missing and where to get it

Tool

Audit pack generator producing the evidence file per scheme

Audit pack generator producing the evidence file per scheme

Tool

Clause-to-record map showing what satisfies each requirement

Clause-to-record map showing what satisfies each requirement

Map

Non-conformance close-out tracker with due dates

Non-conformance close-out tracker with due dates

Tool

End to end

How Assurance & Audit runs, start to finish

The module is modelled as a state machine, so at any point the business knows exactly which stage every record is at and what has to happen next.

  1. 1

    Register the schemes the business holds

    This is where the record starts, and getting it right here removes work at every later stage.

  2. 2

    Map every clause to a platform record

    The platform prompts only for what this stage genuinely needs, and carries everything forward.

  3. 3

    Operate normally, generating records

    Conflicts with scheme rules, regulatory windows and existing commitments are flagged here rather than discovered later.

  4. 4

    Monitor the readiness score continuously

    Capture works offline, so this stage is completed in the field rather than remembered afterwards.

  5. 5

    Run gap analysis ahead of the audit

    Everything recorded at this point becomes evidence automatically, in every format that will later ask for it.

  6. 6

    Close gaps before the visit

    This is the stage most businesses currently do twice, once for the operation and once for the paperwork.

  7. 7

    Host the audit with the pack assembled

    Results feed the whole-farm view, so the effect of this stage is visible against the rest of the business.

  8. 8

    Close out non-conformances and record

    The cycle closes here, and what is learned is carried into next season's plan rather than lost.

Who uses it

Built around four real jobs, not one generic user

Each of these people needs something different from the same record. The module is designed so none of them has to work around the others.

Farm manager

Multiple assurance schemes

Wants the pack assembled rather than spending three days on it.

Assessor

Conducting audits

Needs complete, contemporaneous, verifiable records.

Scheme technical lead

Standard development

Needs to know which clauses generate the most non-conformances.

Buyer

Supply chain assurance

Needs live certification status rather than an annual certificate.

Schemes and funding

Support schemes this module works with

Agrivencia holds these schemes as data, so eligibility, payment rates, caps and windows update the day they change rather than at the next software release.

Rates, caps and windows change frequently and sometimes without notice. Always confirm against the current published scheme rules before applying.

Measurement

How you will know it is working

The module reports against these measures from the day it is switched on, so the value is demonstrable rather than assumed.

  • 01Audit readiness score
  • 02Non-conformances per audit
  • 03Time spent preparing for audit
  • 04Evidence auto-assembled percentage
  • 05Certification continuity

Try it now

Assurance Audit Readiness Score

Ten questions that predict most audit non-conformances, scored with a prioritised list of what to fix first.

How this is calculated

Each answer is weighted by how frequently that area generates non-conformances at audit, and the score is the weighted proportion of areas fully in order. The priority is the highest-weighted area not fully in order.

A high score is not a guarantee. Unannounced audits test what is happening on the day, not what is written down.

Readiness score %
Non-conformance risk
Fix this first

Traceability

The chain behind one batch

Assurance audits ask you to prove a chain you have already lived. The record is assembled as the work happens, so the audit pack is a printout rather than a fortnight of searching.

Sample
Batch reference BATCH-92322B
Subject One load
Record opened On first record

Take the record with you

Sample chain showing the structure and the evidence each stage produces. Statutory reporting windows differ by nation and species — the platform applies the window for the nation the movement happened in, not the one the business is registered in.

Sample

Status

Where it has got to

One tracker for a scheme application, a marketplace order and an evidence submission — because the question is always the same three questions.

Sample

Assurance & audit submission

Reference AGV-9232-8781

  1. Started Complete 14 days ago Draft created and the holding record attached.
  2. Evidence assembled Complete 9 days ago Every required document present and within its validity period.
  3. Checked Complete 8 days ago Internal validation passed; two advisory warnings acknowledged.
  4. Submitted In progress 7 days ago Lodged with Rural Payments Agency. Receipt reference stored against the record.
  5. Under assessment Not started expected The published service standard for this stage is 28 days from a complete submission.
  6. Decision Not started The decision and any conditions attach to the record automatically.
  7. Payment or delivery Not started Scheduled against the payment calendar so cash flow can be planned.
Held by
Rural Payments Agency
Waiting on
The administering body
Service standard
28 days from complete submission
Your next action
None — you will be told if that changes

Sample tracker. Service standards are as published by the administering body and are not guarantees; Agrivencia does not submit on your behalf without an explicit instruction recorded against the holding.

Sample

Questions answered

What people ask about Assurance & Audit

Does this replace the software I already use?

Not necessarily. Agrivencia integrates with authoritative sources and mainstream packages rather than insisting on replacing them. Where an incumbent does one job well, the platform connects to it; where the job spans several systems and nobody does it, the platform does it.

Will it work where I have no signal?

Yes. Field capture in Assurance & Audit is offline first, storing locally and synchronising when a connection returns. Only around a fifth of UK farms report reliable signal across the whole holding, so this is a design assumption rather than a feature.

What happens when the scheme rules change?

Scheme rules are held as data rather than code, so a rate change, a cap change or a window closure is a content update that takes effect the same day. The platform also alerts you to what the change does to your own position.

Who owns the data I put in?

You do. The Farm Data Charter gives you a complete export in open formats at any time, and every instance of data sharing requires an explicit, revocable consent that is visible in your account.

Does it work if I farm across a border?

Yes, and that is one of the main reasons the platform exists. A business with land in more than one nation sees one reconciled view rather than two portals, with obligations and deadlines from both administrations in a single calendar.

Can my agronomist or land agent use it too?

Yes. You grant scoped, time-limited access per holding and per module, and you can revoke it in one click. Advisers never get a shared password or a blanket view.

What is the biggest limitation of this module?

Standard revision changing requirements. Mitigated by version-managed clause mapping. We would rather state that plainly than let you discover it after signing.

Documents

Take it away with you

Everything here is printable and works on a kitchen table with no signal. Where a document asks for an email address, it says so on the button rather than after you press it.

Handbook

The Audit Pack That Assembles Itself: Assurance Without Duplication

PDF · UK · updated on scheme change

The practical handbook for assurance & audit: what the rules require, what the evidence has to show, and the mistakes that cost people money.

Checklist

assurance & audit — evidence checklist

PDF · one page · printable

Every document an audit or a claim asks for, in the order it is asked for, with the validity period of each.

Template

assurance & audit — record template

XLSX and CSV

The record structure the module uses, as a spreadsheet, so a business not yet on the platform can start keeping it correctly today.

Reference

Data model reference

PDF · technical

Entities, fields and integration points for assurance & audit, for advisers and software partners.

Documents are versioned and dated. When a scheme rule changes, the affected document is reissued and anyone who downloaded it is told what changed.

See Assurance & Audit running on your own holding

Thirty minutes, using your parcels, your schemes and your enterprises rather than a sample farm. No obligation and no sales script — if it does not fit your business we will say so.

  • Free tier available
  • No card required
  • Your data stays yours
Next deadlines
15 May Single application form — Wales and Northern Ireland Window 2 open Sustainable Farming Incentive — England, 52% allocated Ongoing Capital grants — allocation moves fast once open Annual Whole Farm Plan components — Scotland, phased deadlines 6 April Inheritance relief cap takes effect — UK wide