Skip to the main content Skip to the instrument panel
0 Help Sign inCreate an account
Weather and agronomy
Air temperature 11 °C
Feels like 9 °C
Conditions Light cloud
Rain today 2.4 mm
Rain last 7 days 18.6 mm
Season to date 412 mm
Wind speed 9 mph
Wind direction WSW
Gusting 17 mph
Humidity 78 %
Pressure 1014 hPa
Delta T 3.1 Evaporative potential during spraying. Outside 2 to 8 the application window is compromised.
UV index 2
Next 24 hours
Five day outlook
Field conditions
Soil temperature at 10cm 8.4 °C
Soil moisture deficit 26 mm
Growing degree days 742 GDD
Frost risk tonight Low
Spray window Open Combines wind speed, Delta T, temperature and rainfall forecast against label conditions.
Travelling conditions Marginal
Workable days this month 11 days
Blight risk Low
Grass growth rate 38 kg DM/ha/day
Latest satellite pass 2 days ago
Time and season
Time
Date
Sunrise
Sunset
Day length
Moon phase
Season
Week
To harvest
Markets and prices
Feed wheat 184.50 £/t
Feed barley 168.00 £/t
Oilseed rape 412.00 £/t
Farmgate milk 43.20 p/l
Deadweight beef 612 p/kg
Deadweight lamb 698 p/kg
Deadweight pig 214 p/kg
Ammonium nitrate 378 £/t
Red diesel 72.4 p/l
Electricity 25.8 p/kWh
Woodland carbon unit 28.32 £
Biodiversity unit 25,000 £
Schemes and deadlines
Open scheme windows 3
Budget allocated 52 % How much of the current scheme budget has been committed. Published at 25, 50 and 75 per cent.
Next deadline 15 May
Claim status In progress
Payments due 18,420 £
Compliance score 86 %

Instrument values are sample data until your holding is connected to a live source. How the data connections work

Climate, Nature & Carbon

Woodland Carbon & Peatland Codes

Pending units are not verified units, and the difference is the whole market.

The UK carbon codes are credible, standardised and widely misunderstood, principally because the pipeline of pending units dwarfs the number actually verified. This module manages project registration, validation, monitoring and verification, shows the true unit position, and provides the price benchmarking and buyer matching that make a sale possible on informed terms.

  • 12 capabilities
  • 4 linked schemes
  • Offline capable
12
Capabilities in this module
5
Interactive tools
4
Linked support schemes
5
Data integrations
5
Measures reported

The ground reality

What is actually happening in carbon codes in the UK

On interim data the Woodland Carbon Code recorded 907 validated projects across 45,467 hectares carrying around 14.17 million Pending Issuance Units but only about 12,700 verified Woodland Carbon Units, because most projects are too young to have sequestered measurable carbon. The Peatland Code recorded 408 registered projects covering 58,860 hectares. Average prices — £28.32 for woodland and £39.57 for peatland units in 2025 — rest on voluntary disclosure and, in the peatland case, are skewed by a small number of large transactions.

Figures are as published at the time of writing. Farm policy and payment rates change frequently — verify against the primary source before relying on any number here.

In the field

Carbon codes, as it actually looks

Photography from working UK holdings alongside the interface that records it. Every frame below is a commissioned slot: the brief is stated until the photograph is taken.

Carbon Codes — a walkthrough

A working pass through carbon codes: entering the record once, and watching it appear in the evidence pack, the calendar and the scheme application without being typed again.

Film in production

Captions · Audio described

  1. 0:00 What the module is for
  2. 0:48 Entering the record
  3. 2:05 Where it appears next
  4. 3:20 The evidence pack

Photography slots state their own brief until the shot is commissioned, so the layout never shifts when real images arrive.

Capabilities

What Carbon Codes does

Every capability below is built on the same underlying record, so entering something once is enough for it to appear wherever it is needed.

Record and plan

  • Project eligibility assessment against code requirements including additionality
  • Project registration and documentation assembly
  • Validation process management with validator coordination

Operate and monitor

  • Carbon sequestration modelling by species, yield class and management
  • Pending Issuance Unit and verified unit position tracking, clearly distinguished
  • Monitoring schedule with field survey and evidence capture

Comply and evidence

  • Verification event management and unit issuance recording
  • UK Land Carbon Registry position reconciliation
  • Price benchmarking against disclosed transaction data with caveats stated

Analyse and improve

  • Buyer matching and sale process management
  • Permanence, reversal and buffer pool obligation tracking
  • Stacking assessment against public scheme payments and biodiversity units

Interactive

Tools you actually use, not screens you read

These are working interfaces inside the module — maps, calculators, planners and dashboards that respond to your own holding data.

Unit position chart separating pending from verified over the project life

Unit position chart separating pending from verified over the project life

Chart

Sequestration projection model by species mix and yield class

Sequestration projection model by species mix and yield class

Tool

Price benchmark viewer with disclosure caveats shown prominently

Price benchmark viewer with disclosure caveats shown prominently

Tool

Stacking checker showing which income can and cannot be combined

Stacking checker showing which income can and cannot be combined

Wizard

Verification schedule planner with cost forecasting

Verification schedule planner with cost forecasting

Builder

End to end

How Carbon Codes runs, start to finish

The module is modelled as a state machine, so at any point the business knows exactly which stage every record is at and what has to happen next.

  1. 1

    Assess eligibility and additionality

    This is where the record starts, and getting it right here removes work at every later stage.

  2. 2

    Model sequestration over the project life

    The platform prompts only for what this stage genuinely needs, and carries everything forward.

  3. 3

    Register the project on the code

    Conflicts with scheme rules, regulatory windows and existing commitments are flagged here rather than discovered later.

  4. 4

    Complete validation

    Capture works offline, so this stage is completed in the field rather than remembered afterwards.

  5. 5

    Deliver and monitor the project

    Everything recorded at this point becomes evidence automatically, in every format that will later ask for it.

  6. 6

    Verify at scheduled intervals

    This is the stage most businesses currently do twice, once for the operation and once for the paperwork.

  7. 7

    Record issuance on the registry

    Results feed the whole-farm view, so the effect of this stage is visible against the rest of the business.

  8. 8

    Sell or retire units with full disclosure

    The cycle closes here, and what is learned is carried into next season's plan rather than lost.

Who uses it

Built around four real jobs, not one generic user

Each of these people needs something different from the same record. The module is designed so none of them has to work around the others.

Landowner

Registering a woodland project

Needs realistic cashflow, not a headline unit count.

Project developer

Aggregating sites

Needs portfolio-level pending and verified positions.

Corporate buyer

Offtake agreement

Needs clarity on what is actually verified versus forecast.

Land agent

Advising clients

Needs permanence obligations explained before signature.

Measurement

How you will know it is working

The module reports against these measures from the day it is switched on, so the value is demonstrable rather than assumed.

  • 01Hectares registered
  • 02Units validated
  • 03Units verified and issued
  • 04Price achieved per unit
  • 05Verification cost per unit

Payment schedule

What is due, and when it lands

Farm support arrives in instalments from several bodies on different calendars. Set against your own overdraft, the question is not how much but when — so the ledger is ordered by date, not by scheme.

Sample
Scheduled and expected scheme payments, in date order
When Payment From Amount Status
March Woodland Carbon Code Scottish Forestry on behalf of all four governments Expected
March Peatland Code IUCN UK Peatland Programme Agreed
September England Woodland Creation Offer Forestry Commission Eligible
May Nature for Climate Peatland Restoration Defra / Natural England Eligible
June Sustainable Farming Incentive 2026 Defra / Rural Payments Agency Eligible
March Countryside Stewardship Defra / Natural England / Rural Payments Agency Eligible
  • Agreed and scheduled
  • Claimed, awaiting payment
  • Eligible, unclaimed

What the statuses mean

Agreed
Under a signed agreement with a scheduled payment date.
Expected
Claimed and assessed; payment date per the published standard.
Eligible
Your holding appears to qualify but nothing is claimed yet.

Amounts are blank because they depend on your own holding, your agreements and current payment rates. Rates change during a scheme year, so the ledger always shows the rate it used and the date it read it.

Sample

Benchmarking

How this compares with businesses like yours

A cohort is only useful if it is genuinely comparable, so it is built from farm type, soil grade, region and scale rather than from whoever happens to have signed up. Your own figure is never shown to anyone else.

Sample
  • Hectares registered

    Lower quartile 26 Median 61 Upper quartile 82

  • Units validated

    Lower quartile 37 Median 52 Upper quartile 68

  • Units verified and issued

    Lower quartile 39 Median 54 Upper quartile 80

  • Price achieved per unit

    Lower quartile 22 Median 57 Upper quartile 87

  • Verification cost per unit

    Lower quartile 24 Median 57 Upper quartile 85

How the cohort is built

Farm type
Matched
Soil grade
Matched
Region
Matched
Scale band
Matched
Cohort size
Minimum 12 businesses, or no comparison is shown

Quartiles are illustrative until a cohort exists. A comparison is suppressed entirely below twelve businesses, because with fewer than that a farmer can work out whose figures they are looking at.

Sample

Questions answered

What people ask about Carbon Codes

Does this replace the software I already use?

Not necessarily. Agrivencia integrates with authoritative sources and mainstream packages rather than insisting on replacing them. Where an incumbent does one job well, the platform connects to it; where the job spans several systems and nobody does it, the platform does it.

Will it work where I have no signal?

Yes. Field capture in Carbon Codes is offline first, storing locally and synchronising when a connection returns. Only around a fifth of UK farms report reliable signal across the whole holding, so this is a design assumption rather than a feature.

What happens when the scheme rules change?

Scheme rules are held as data rather than code, so a rate change, a cap change or a window closure is a content update that takes effect the same day. The platform also alerts you to what the change does to your own position.

Who owns the data I put in?

You do. The Farm Data Charter gives you a complete export in open formats at any time, and every instance of data sharing requires an explicit, revocable consent that is visible in your account.

Does it work if I farm across a border?

Yes, and that is one of the main reasons the platform exists. A business with land in more than one nation sees one reconciled view rather than two portals, with obligations and deadlines from both administrations in a single calendar.

Can my agronomist or land agent use it too?

Yes. You grant scoped, time-limited access per holding and per module, and you can revoke it in one click. Advisers never get a shared password or a blanket view.

What is the biggest limitation of this module?

Pending units mistaken for saleable inventory. Mitigated by explicit separation in every view. We would rather state that plainly than let you discover it after signing.

Documents

Take it away with you

Everything here is printable and works on a kitchen table with no signal. Where a document asks for an email address, it says so on the button rather than after you press it.

Handbook

Pending Versus Verified: What a UK Carbon Code Project Is Actually Worth

PDF · UK · updated on scheme change

The practical handbook for carbon codes: what the rules require, what the evidence has to show, and the mistakes that cost people money.

Checklist

carbon codes — evidence checklist

PDF · one page · printable

Every document an audit or a claim asks for, in the order it is asked for, with the validity period of each.

Template

carbon codes — record template

XLSX and CSV

The record structure the module uses, as a spreadsheet, so a business not yet on the platform can start keeping it correctly today.

Reference

Data model reference

PDF · technical

Entities, fields and integration points for carbon codes, for advisers and software partners.

Documents are versioned and dated. When a scheme rule changes, the affected document is reissued and anyone who downloaded it is told what changed.

See Carbon Codes running on your own holding

Thirty minutes, using your parcels, your schemes and your enterprises rather than a sample farm. No obligation and no sales script — if it does not fit your business we will say so.

  • Free tier available
  • No card required
  • Your data stays yours
Next deadlines
15 May Single application form — Wales and Northern Ireland Window 2 open Sustainable Farming Incentive — England, 52% allocated Ongoing Capital grants — allocation moves fast once open Annual Whole Farm Plan components — Scotland, phased deadlines 6 April Inheritance relief cap takes effect — UK wide