Skip to the main content Skip to the instrument panel
0 Help Sign inCreate an account
Weather and agronomy
Air temperature 11 °C
Feels like 9 °C
Conditions Light cloud
Rain today 2.4 mm
Rain last 7 days 18.6 mm
Season to date 412 mm
Wind speed 9 mph
Wind direction WSW
Gusting 17 mph
Humidity 78 %
Pressure 1014 hPa
Delta T 3.1 Evaporative potential during spraying. Outside 2 to 8 the application window is compromised.
UV index 2
Next 24 hours
Five day outlook
Field conditions
Soil temperature at 10cm 8.4 °C
Soil moisture deficit 26 mm
Growing degree days 742 GDD
Frost risk tonight Low
Spray window Open Combines wind speed, Delta T, temperature and rainfall forecast against label conditions.
Travelling conditions Marginal
Workable days this month 11 days
Blight risk Low
Grass growth rate 38 kg DM/ha/day
Latest satellite pass 2 days ago
Time and season
Time
Date
Sunrise
Sunset
Day length
Moon phase
Season
Week
To harvest
Markets and prices
Feed wheat 184.50 £/t
Feed barley 168.00 £/t
Oilseed rape 412.00 £/t
Farmgate milk 43.20 p/l
Deadweight beef 612 p/kg
Deadweight lamb 698 p/kg
Deadweight pig 214 p/kg
Ammonium nitrate 378 £/t
Red diesel 72.4 p/l
Electricity 25.8 p/kWh
Woodland carbon unit 28.32 £
Biodiversity unit 25,000 £
Schemes and deadlines
Open scheme windows 3
Budget allocated 52 % How much of the current scheme budget has been committed. Published at 25, 50 and 75 per cent.
Next deadline 15 May
Claim status In progress
Payments due 18,420 £
Compliance score 86 %

Instrument values are sample data until your holding is connected to a live source. How the data connections work

Finance, Schemes & Compliance

Regulatory Compliance Calendar

Every obligation, every nation, every date, in one place.

A UK farm business is subject to obligations from several regulators, paying agencies, assurance schemes and statutory regimes, each with its own dates. This module assembles them into one calendar filtered to the business's actual activities, nations and schemes, and escalates before anything is missed.

  • 12 capabilities
  • 4 linked schemes
  • Offline capable
12
Capabilities in this module
5
Interactive tools
4
Linked support schemes
5
Data integrations
5
Measures reported

The ground reality

What is actually happening in compliance calendar in the UK

Obligations diverge materially by nation, and the same business operating across a border faces two or more sets of dates for equivalent activities. Missed dates carry consequences ranging from payment reduction through to enforcement, and the most common cause is not unwillingness but the absence of a single consolidated view.

Figures are as published at the time of writing. Farm policy and payment rates change frequently — verify against the primary source before relying on any number here.

In the field

Compliance calendar, as it actually looks

Photography from working UK holdings alongside the interface that records it. Every frame below is a commissioned slot: the brief is stated until the photograph is taken.

Compliance Calendar — a walkthrough

A working pass through compliance calendar: entering the record once, and watching it appear in the evidence pack, the calendar and the scheme application without being typed again.

Film in production

Captions · Audio described

  1. 0:00 What the module is for
  2. 0:48 Entering the record
  3. 2:05 Where it appears next
  4. 3:20 The evidence pack

Photography slots state their own brief until the shot is commissioned, so the layout never shifts when real images arrive.

Capabilities

What Compliance Calendar does

Every capability below is built on the same underlying record, so entering something once is enough for it to appear wherever it is needed.

Record and plan

  • Consolidated obligation register across every applicable regime
  • Nation-specific filtering so only relevant obligations are shown
  • Activity-based filtering driven by the enterprises actually operated

Operate and monitor

  • Scheme claim, evidence and inspection date tracking
  • Statutory return, notification and registration renewal dates
  • Assurance audit and certification expiry tracking

Comply and evidence

  • Closed period, cutting ban and seasonal restriction calendar
  • Licence, permit and authorisation renewal management
  • Training, certification and competence expiry alerting

Analyse and improve

  • Escalation rules with configurable lead times and recipients
  • Completion recording with evidence attachment
  • Regulatory change monitoring with impact assessment on the calendar

Interactive

Tools you actually use, not screens you read

These are working interfaces inside the module — maps, calculators, planners and dashboards that respond to your own holding data.

Master calendar with nation, regime and enterprise filters

Master calendar with nation, regime and enterprise filters

Tool

Countdown board for the next thirty, sixty and ninety days

Countdown board for the next thirty, sixty and ninety days

Dashboard

Obligation detail view with the source, the consequence and the evidence required

Obligation detail view with the source, the consequence and the evidence required

Tool

Escalation configuration by obligation type and responsible person

Escalation configuration by obligation type and responsible person

Tool

Compliance completeness score across the whole business

Compliance completeness score across the whole business

Tool

End to end

How Compliance Calendar runs, start to finish

The module is modelled as a state machine, so at any point the business knows exactly which stage every record is at and what has to happen next.

  1. 1

    Register nations, enterprises and schemes

    This is where the record starts, and getting it right here removes work at every later stage.

  2. 2

    Generate the applicable obligation set

    The platform prompts only for what this stage genuinely needs, and carries everything forward.

  3. 3

    Assign responsibility for each obligation

    Conflicts with scheme rules, regulatory windows and existing commitments are flagged here rather than discovered later.

  4. 4

    Configure escalation lead times

    Capture works offline, so this stage is completed in the field rather than remembered afterwards.

  5. 5

    Complete obligations and attach evidence

    Everything recorded at this point becomes evidence automatically, in every format that will later ask for it.

  6. 6

    Monitor the completeness score

    This is the stage most businesses currently do twice, once for the operation and once for the paperwork.

  7. 7

    Respond to regulatory change

    Results feed the whole-farm view, so the effect of this stage is visible against the rest of the business.

  8. 8

    Review annually against activity changes

    The cycle closes here, and what is learned is carried into next season's plan rather than lost.

Who uses it

Built around four real jobs, not one generic user

Each of these people needs something different from the same record. The module is designed so none of them has to work around the others.

Farm business owner

Ultimately responsible

Needs one view rather than a wall planner and four portals.

Farm secretary

Administration

Needs escalation before a date, not a reminder after it.

Cross-border business

Two nations

Needs both sets of obligations reconciled in one calendar.

Consultant

Client compliance

Needs a portfolio view of client obligations and risk.

Measurement

How you will know it is working

The module reports against these measures from the day it is switched on, so the value is demonstrable rather than assumed.

  • 01Obligations completed on time
  • 02Compliance completeness score
  • 03Escalations required
  • 04Penalties or reductions incurred
  • 05Regulatory changes incorporated

Obligation calendar

What compliance calendar asks of you, and when

Windows, deadlines and recurring obligations for England. Set a different nation and the calendar reconfigures; farm across a border and it shows both, reconciled.

  • Scheme window or deadline
  • Recurring farm obligation
  • Statutory return
  1. January 1 entry

  2. March 2 entries

    • 16 March: Farm Sustainability Payment

      Application from early March with a deadline in mid-May.

      DAERA northern-ireland

    • 22 March: Register nations, enterprises and schemes

      A recurring step in compliance calendar.

  3. May 1 entry

    • 26 May: Sustainable Farming Scheme

      Scheme year runs to 31 December, with the single application form deadline in mid-May.

      Welsh Government / Rural Payments Wales wales

  4. June 4 entries

    • 4 June: Generate the applicable obligation set

      A recurring step in compliance calendar.

    • 5 June: Farming Transformation Fund

      Round-based by theme.

      Defra / Rural Payments Agency england

    • 15 June: Sustainable Farming Incentive 2026

      Two windows in 2026: window one from 30 June, window two from September.

      Defra / Rural Payments Agency england

    • 21 June: Assign responsibility for each obligation

      A recurring step in compliance calendar.

  5. July 1 entry

  6. September 1 entry

    • 5 September: Configure escalation lead times

      A recurring step in compliance calendar.

  7. October 1 entry

  8. November 2 entries

  9. December 1 entry

    • 26 December: Countryside Stewardship

      Rolling and round-based depending on the tier and option group.

      Defra / Natural England / Rural Payments Agency england

Windows move, and sometimes at short notice. Every entry links to the publishing body so you can confirm the current date before you rely on it.

Payment schedule

What is due, and when it lands

Farm support arrives in instalments from several bodies on different calendars. Set against your own overdraft, the question is not how much but when — so the ledger is ordered by date, not by scheme.

Sample
Scheduled and expected scheme payments, in date order
When Payment From Amount Status
June Sustainable Farming Incentive 2026 Defra / Rural Payments Agency Expected
May Sustainable Farming Scheme Welsh Government / Rural Payments Wales Agreed
March Farm Sustainability Payment DAERA Eligible
March Scottish Base and Enhanced Level Direct Payments Scottish Government / Rural Payments and Inspections Division Eligible
March Countryside Stewardship Defra / Natural England / Rural Payments Agency Eligible
June Environmental Land Management Capital Grants Defra / Rural Payments Agency Eligible
  • Agreed and scheduled
  • Claimed, awaiting payment
  • Eligible, unclaimed

What the statuses mean

Agreed
Under a signed agreement with a scheduled payment date.
Expected
Claimed and assessed; payment date per the published standard.
Eligible
Your holding appears to qualify but nothing is claimed yet.

Amounts are blank because they depend on your own holding, your agreements and current payment rates. Rates change during a scheme year, so the ledger always shows the rate it used and the date it read it.

Sample

Questions answered

What people ask about Compliance Calendar

Does this replace the software I already use?

Not necessarily. Agrivencia integrates with authoritative sources and mainstream packages rather than insisting on replacing them. Where an incumbent does one job well, the platform connects to it; where the job spans several systems and nobody does it, the platform does it.

Will it work where I have no signal?

Yes. Field capture in Compliance Calendar is offline first, storing locally and synchronising when a connection returns. Only around a fifth of UK farms report reliable signal across the whole holding, so this is a design assumption rather than a feature.

What happens when the scheme rules change?

Scheme rules are held as data rather than code, so a rate change, a cap change or a window closure is a content update that takes effect the same day. The platform also alerts you to what the change does to your own position.

Who owns the data I put in?

You do. The Farm Data Charter gives you a complete export in open formats at any time, and every instance of data sharing requires an explicit, revocable consent that is visible in your account.

Does it work if I farm across a border?

Yes, and that is one of the main reasons the platform exists. A business with land in more than one nation sees one reconciled view rather than two portals, with obligations and deadlines from both administrations in a single calendar.

Can my agronomist or land agent use it too?

Yes. You grant scoped, time-limited access per holding and per module, and you can revoke it in one click. Advisers never get a shared password or a blanket view.

What is the biggest limitation of this module?

Incomplete obligation set. Mitigated by activity-driven generation and periodic review. We would rather state that plainly than let you discover it after signing.

Documents

Take it away with you

Everything here is printable and works on a kitchen table with no signal. Where a document asks for an email address, it says so on the button rather than after you press it.

Handbook

One Calendar, Four Nations: Consolidating Farm Regulatory Obligations

PDF · UK · updated on scheme change

The practical handbook for compliance calendar: what the rules require, what the evidence has to show, and the mistakes that cost people money.

Checklist

compliance calendar — evidence checklist

PDF · one page · printable

Every document an audit or a claim asks for, in the order it is asked for, with the validity period of each.

Template

compliance calendar — record template

XLSX and CSV

The record structure the module uses, as a spreadsheet, so a business not yet on the platform can start keeping it correctly today.

Reference

Data model reference

PDF · technical

Entities, fields and integration points for compliance calendar, for advisers and software partners.

Documents are versioned and dated. When a scheme rule changes, the affected document is reissued and anyone who downloaded it is told what changed.

See Compliance Calendar running on your own holding

Thirty minutes, using your parcels, your schemes and your enterprises rather than a sample farm. No obligation and no sales script — if it does not fit your business we will say so.

  • Free tier available
  • No card required
  • Your data stays yours
Next deadlines
15 May Single application form — Wales and Northern Ireland Window 2 open Sustainable Farming Incentive — England, 52% allocated Ongoing Capital grants — allocation moves fast once open Annual Whole Farm Plan components — Scotland, phased deadlines 6 April Inheritance relief cap takes effect — UK wide