Finance, Schemes & Compliance
Regulatory Compliance Calendar
Every obligation, every nation, every date, in one place.
A UK farm business is subject to obligations from several regulators, paying agencies, assurance schemes and statutory regimes, each with its own dates. This module assembles them into one calendar filtered to the business's actual activities, nations and schemes, and escalates before anything is missed.
- 12 capabilities
- 4 linked schemes
- Offline capable
- 12
- Capabilities in this module
- 5
- Interactive tools
- 4
- Linked support schemes
- 5
- Data integrations
- 5
- Measures reported
The ground reality
What is actually happening in compliance calendar in the UK
Obligations diverge materially by nation, and the same business operating across a border faces two or more sets of dates for equivalent activities. Missed dates carry consequences ranging from payment reduction through to enforcement, and the most common cause is not unwillingness but the absence of a single consolidated view.
Figures are as published at the time of writing. Farm policy and payment rates change frequently — verify against the primary source before relying on any number here.
In the field
Compliance calendar, as it actually looks
Photography from working UK holdings alongside the interface that records it. Every frame below is a commissioned slot: the brief is stated until the photograph is taken.
Compliance Calendar — a walkthrough
A working pass through compliance calendar: entering the record once, and watching it appear in the evidence pack, the calendar and the scheme application without being typed again.
- 0:00 What the module is for
- 0:48 Entering the record
- 2:05 Where it appears next
- 3:20 The evidence pack
Photography slots state their own brief until the shot is commissioned, so the layout never shifts when real images arrive.
Capabilities
What Compliance Calendar does
Every capability below is built on the same underlying record, so entering something once is enough for it to appear wherever it is needed.
Record and plan
- Consolidated obligation register across every applicable regime
- Nation-specific filtering so only relevant obligations are shown
- Activity-based filtering driven by the enterprises actually operated
Operate and monitor
- Scheme claim, evidence and inspection date tracking
- Statutory return, notification and registration renewal dates
- Assurance audit and certification expiry tracking
Comply and evidence
- Closed period, cutting ban and seasonal restriction calendar
- Licence, permit and authorisation renewal management
- Training, certification and competence expiry alerting
Analyse and improve
- Escalation rules with configurable lead times and recipients
- Completion recording with evidence attachment
- Regulatory change monitoring with impact assessment on the calendar
Interactive
Tools you actually use, not screens you read
These are working interfaces inside the module — maps, calculators, planners and dashboards that respond to your own holding data.
Master calendar with nation, regime and enterprise filters
Master calendar with nation, regime and enterprise filters
ToolCountdown board for the next thirty, sixty and ninety days
Countdown board for the next thirty, sixty and ninety days
DashboardObligation detail view with the source, the consequence and the evidence required
Obligation detail view with the source, the consequence and the evidence required
ToolEscalation configuration by obligation type and responsible person
Escalation configuration by obligation type and responsible person
ToolCompliance completeness score across the whole business
Compliance completeness score across the whole business
ToolEnd to end
How Compliance Calendar runs, start to finish
The module is modelled as a state machine, so at any point the business knows exactly which stage every record is at and what has to happen next.
-
1
Register nations, enterprises and schemes
This is where the record starts, and getting it right here removes work at every later stage.
-
2
Generate the applicable obligation set
The platform prompts only for what this stage genuinely needs, and carries everything forward.
-
3
Assign responsibility for each obligation
Conflicts with scheme rules, regulatory windows and existing commitments are flagged here rather than discovered later.
-
4
Configure escalation lead times
Capture works offline, so this stage is completed in the field rather than remembered afterwards.
-
5
Complete obligations and attach evidence
Everything recorded at this point becomes evidence automatically, in every format that will later ask for it.
-
6
Monitor the completeness score
This is the stage most businesses currently do twice, once for the operation and once for the paperwork.
-
7
Respond to regulatory change
Results feed the whole-farm view, so the effect of this stage is visible against the rest of the business.
-
8
Review annually against activity changes
The cycle closes here, and what is learned is carried into next season's plan rather than lost.
Who uses it
Built around four real jobs, not one generic user
Each of these people needs something different from the same record. The module is designed so none of them has to work around the others.
Farm business owner
Ultimately responsible
Needs one view rather than a wall planner and four portals.
Farm secretary
Administration
Needs escalation before a date, not a reminder after it.
Cross-border business
Two nations
Needs both sets of obligations reconciled in one calendar.
Consultant
Client compliance
Needs a portfolio view of client obligations and risk.
Schemes and funding
Support schemes this module works with
Agrivencia holds these schemes as data, so eligibility, payment rates, caps and windows update the day they change rather than at the next software release.
Sustainable Farming Incentive 2026
Pay farmers for environmental actions taken alongside food production, as the principal replacement for area-based direct payments in England.
Defra / Rural Payments Agency WalesSustainable Farming Scheme
Replace area-based direct payments in Wales with a scheme rewarding sustainable land management outcomes.
Welsh Government / Rural Payments Wales Northern IrelandFarm Sustainability Payment
Provide an area-based safety-net payment to Northern Ireland farm businesses with sustainability conditionality.
DAERA ScotlandScottish Base and Enhanced Level Direct Payments
Provide base level income support conditional on essential standards, with an enhanced tier for additional climate and nature action.
Scottish Government / Rural Payments and Inspections DivisionRates, caps and windows change frequently and sometimes without notice. Always confirm against the current published scheme rules before applying.
Measurement
How you will know it is working
The module reports against these measures from the day it is switched on, so the value is demonstrable rather than assumed.
- 01Obligations completed on time
- 02Compliance completeness score
- 03Escalations required
- 04Penalties or reductions incurred
- 05Regulatory changes incorporated
Obligation calendar
What compliance calendar asks of you, and when
Windows, deadlines and recurring obligations for England. Set a different nation and the calendar reconfigures; farm across a border and it shows both, reconciled.
-
January 1 entry
-
11 January: Scottish Base and Enhanced Level Direct Payments
Annual application, single application form.
-
-
March 2 entries
-
16 March: Farm Sustainability Payment
Application from early March with a deadline in mid-May.
-
22 March: Register nations, enterprises and schemes
A recurring step in compliance calendar.
-
-
May 1 entry
-
26 May: Sustainable Farming Scheme
Scheme year runs to 31 December, with the single application form deadline in mid-May.
-
-
June 4 entries
-
4 June: Generate the applicable obligation set
A recurring step in compliance calendar.
-
5 June: Farming Transformation Fund
Round-based by theme.
-
15 June: Sustainable Farming Incentive 2026
Two windows in 2026: window one from 30 June, window two from September.
-
21 June: Assign responsibility for each obligation
A recurring step in compliance calendar.
-
-
July 1 entry
-
14 July: Slurry Infrastructure Grant
Round-based.
-
-
September 1 entry
-
5 September: Configure escalation lead times
A recurring step in compliance calendar.
-
-
October 1 entry
-
5 October: Farming Equipment and Technology Fund
Round-based, usually open for a defined application period.
-
-
November 2 entries
-
12 November: Improving Farm Productivity Grant
Round-based.
-
27 November: Environmental Land Management Capital Grants
Round-based, with rapid allocation once open.
-
-
December 1 entry
-
26 December: Countryside Stewardship
Rolling and round-based depending on the tier and option group.
-
Payment schedule
What is due, and when it lands
Farm support arrives in instalments from several bodies on different calendars. Set against your own overdraft, the question is not how much but when — so the ledger is ordered by date, not by scheme.
| When | Payment | From | Amount | Status |
|---|---|---|---|---|
| June | Sustainable Farming Incentive 2026 | Defra / Rural Payments Agency | — | Expected |
| May | Sustainable Farming Scheme | Welsh Government / Rural Payments Wales | — | Agreed |
| March | Farm Sustainability Payment | DAERA | — | Eligible |
| March | Scottish Base and Enhanced Level Direct Payments | Scottish Government / Rural Payments and Inspections Division | — | Eligible |
| March | Countryside Stewardship | Defra / Natural England / Rural Payments Agency | — | Eligible |
| June | Environmental Land Management Capital Grants | Defra / Rural Payments Agency | — | Eligible |
- — Agreed and scheduled
- — Claimed, awaiting payment
- — Eligible, unclaimed
What the statuses mean
- Agreed
- Under a signed agreement with a scheduled payment date.
- Expected
- Claimed and assessed; payment date per the published standard.
- Eligible
- Your holding appears to qualify but nothing is claimed yet.
Questions answered
What people ask about Compliance Calendar
Does this replace the software I already use?
Not necessarily. Agrivencia integrates with authoritative sources and mainstream packages rather than insisting on replacing them. Where an incumbent does one job well, the platform connects to it; where the job spans several systems and nobody does it, the platform does it.
Will it work where I have no signal?
Yes. Field capture in Compliance Calendar is offline first, storing locally and synchronising when a connection returns. Only around a fifth of UK farms report reliable signal across the whole holding, so this is a design assumption rather than a feature.
What happens when the scheme rules change?
Scheme rules are held as data rather than code, so a rate change, a cap change or a window closure is a content update that takes effect the same day. The platform also alerts you to what the change does to your own position.
Who owns the data I put in?
You do. The Farm Data Charter gives you a complete export in open formats at any time, and every instance of data sharing requires an explicit, revocable consent that is visible in your account.
Does it work if I farm across a border?
Yes, and that is one of the main reasons the platform exists. A business with land in more than one nation sees one reconciled view rather than two portals, with obligations and deadlines from both administrations in a single calendar.
Can my agronomist or land agent use it too?
Yes. You grant scoped, time-limited access per holding and per module, and you can revoke it in one click. Advisers never get a shared password or a blanket view.
What is the biggest limitation of this module?
Incomplete obligation set. Mitigated by activity-driven generation and periodic review. We would rather state that plainly than let you discover it after signing.
Documents
Take it away with you
Everything here is printable and works on a kitchen table with no signal. Where a document asks for an email address, it says so on the button rather than after you press it.
One Calendar, Four Nations: Consolidating Farm Regulatory Obligations
The practical handbook for compliance calendar: what the rules require, what the evidence has to show, and the mistakes that cost people money.
compliance calendar — evidence checklist
Every document an audit or a claim asks for, in the order it is asked for, with the validity period of each.
compliance calendar — record template
The record structure the module uses, as a spreadsheet, so a business not yet on the platform can start keeping it correctly today.
Data model reference
Entities, fields and integration points for compliance calendar, for advisers and software partners.
See Compliance Calendar running on your own holding
Thirty minutes, using your parcels, your schemes and your enterprises rather than a sample farm. No obligation and no sales script — if it does not fit your business we will say so.
- Free tier available
- No card required
- Your data stays yours