Skip to the main content Skip to the instrument panel
0 Help Sign inCreate an account
Weather and agronomy
Air temperature 11 °C
Feels like 9 °C
Conditions Light cloud
Rain today 2.4 mm
Rain last 7 days 18.6 mm
Season to date 412 mm
Wind speed 9 mph
Wind direction WSW
Gusting 17 mph
Humidity 78 %
Pressure 1014 hPa
Delta T 3.1 Evaporative potential during spraying. Outside 2 to 8 the application window is compromised.
UV index 2
Next 24 hours
Five day outlook
Field conditions
Soil temperature at 10cm 8.4 °C
Soil moisture deficit 26 mm
Growing degree days 742 GDD
Frost risk tonight Low
Spray window Open Combines wind speed, Delta T, temperature and rainfall forecast against label conditions.
Travelling conditions Marginal
Workable days this month 11 days
Blight risk Low
Grass growth rate 38 kg DM/ha/day
Latest satellite pass 2 days ago
Time and season
Time
Date
Sunrise
Sunset
Day length
Moon phase
Season
Week
To harvest
Markets and prices
Feed wheat 184.50 £/t
Feed barley 168.00 £/t
Oilseed rape 412.00 £/t
Farmgate milk 43.20 p/l
Deadweight beef 612 p/kg
Deadweight lamb 698 p/kg
Deadweight pig 214 p/kg
Ammonium nitrate 378 £/t
Red diesel 72.4 p/l
Electricity 25.8 p/kWh
Woodland carbon unit 28.32 £
Biodiversity unit 25,000 £
Schemes and deadlines
Open scheme windows 3
Budget allocated 52 % How much of the current scheme budget has been committed. Published at 25, 50 and 75 per cent.
Next deadline 15 May
Claim status In progress
Payments due 18,420 £
Compliance score 86 %

Instrument values are sample data until your holding is connected to a live source. How the data connections work

Regulatory Compliance Calendar

Compliance Calendar: Overview

The short version of what Compliance Calendar does and why it exists.

A UK farm business is subject to obligations from several regulators, paying agencies, assurance schemes and statutory regimes, each with its own dates. This module assembles them into one calendar filtered to the business's actual activities, nations and schemes, and escalates before anything is missed.

Detail

Why Compliance Calendar exists

A UK farm business is subject to obligations from several regulators, paying agencies, assurance schemes and statutory regimes, each with its own dates. This module assembles them into one calendar filtered to the business's actual activities, nations and schemes, and escalates before anything is missed.

Obligations diverge materially by nation, and the same business operating across a border faces two or more sets of dates for equivalent activities. Missed dates carry consequences ranging from payment reduction through to enforcement, and the most common cause is not unwillingness but the absence of a single consolidated view.

Everything Compliance Calendar records is written into the same platform data spine as every other module, which is why a single entry can satisfy an operational need, a scheme evidence requirement, an assurance clause and a carbon activity line at once. That is the whole design premise: the work is already being done, and it is the recording of it that is duplicated.

The ground reality

What is actually happening in compliance calendar in the UK

Obligations diverge materially by nation, and the same business operating across a border faces two or more sets of dates for equivalent activities. Missed dates carry consequences ranging from payment reduction through to enforcement, and the most common cause is not unwillingness but the absence of a single consolidated view.

Figures are as published at the time of writing. Farm policy and payment rates change frequently — verify against the primary source before relying on any number here.

In the field

Compliance calendar, as it actually looks

Photography from working UK holdings alongside the interface that records it. Every frame below is a commissioned slot: the brief is stated until the photograph is taken.

Compliance Calendar — a walkthrough

A working pass through compliance calendar: entering the record once, and watching it appear in the evidence pack, the calendar and the scheme application without being typed again.

Film in production

Captions · Audio described

  1. 0:00 What the module is for
  2. 0:48 Entering the record
  3. 2:05 Where it appears next
  4. 3:20 The evidence pack

Photography slots state their own brief until the shot is commissioned, so the layout never shifts when real images arrive.

In practice

Six things Compliance Calendar changes on day one

None of these requires a new process. They all come from recording the work you already do, once, in a form the rest of the platform can use.

Consolidated obligation register across every

Consolidated obligation register across every applicable regime.

Nation-specific filtering so only relevant

Nation-specific filtering so only relevant obligations are shown.

Activity-based filtering driven by the

Activity-based filtering driven by the enterprises actually operated.

Scheme claim, evidence and inspection

Scheme claim, evidence and inspection date tracking.

Statutory return, notification and registration

Statutory return, notification and registration renewal dates.

Assurance audit and certification expiry

Assurance audit and certification expiry tracking.

End to end

How Compliance Calendar runs, start to finish

The module is modelled as a state machine, so at any point the business knows exactly which stage every record is at and what has to happen next.

  1. 1

    Register nations, enterprises and schemes

    This is where the record starts, and getting it right here removes work at every later stage.

  2. 2

    Generate the applicable obligation set

    The platform prompts only for what this stage genuinely needs, and carries everything forward.

  3. 3

    Assign responsibility for each obligation

    Conflicts with scheme rules, regulatory windows and existing commitments are flagged here rather than discovered later.

  4. 4

    Configure escalation lead times

    Capture works offline, so this stage is completed in the field rather than remembered afterwards.

  5. 5

    Complete obligations and attach evidence

    Everything recorded at this point becomes evidence automatically, in every format that will later ask for it.

  6. 6

    Monitor the completeness score

    This is the stage most businesses currently do twice, once for the operation and once for the paperwork.

  7. 7

    Respond to regulatory change

    Results feed the whole-farm view, so the effect of this stage is visible against the rest of the business.

  8. 8

    Review annually against activity changes

    The cycle closes here, and what is learned is carried into next season's plan rather than lost.

How we handle evidence

Where these figures come from

Agrivencia grades every figure it publishes. Primary legislation, official statistics and audit reports are treated as authoritative. Levy body and professional body data is treated as reliable. Commercial trackers and trade press are treated as indicative and labelled as such. Where sources conflict, the conflict is shown rather than resolved silently.

  1. Authoritative Legislation, statutory instruments, official scheme rules, national audit and public accounts reporting, departmental annual reports and accredited official statistics.
  2. Reliable Parliamentary committee evidence, peer-reviewed research, independent economic institutes and levy body analysis.
  3. Supporting Professional bodies, land agents, certification schemes and industry associations.
  4. Indicative Commercial market trackers and trade press, used for corroboration only and always labelled.

Payment rates, caps and windows in UK farm support change frequently and sometimes without notice. Nothing on this platform is a substitute for the current published scheme rules or for professional advice.

Free assessment

Find out where you stand in about ten minutes

A structured assessment producing a scored report with a prioritised list of what to fix first, and what it is worth fixing.

Next deadlines
15 May Single application form — Wales and Northern Ireland Window 2 open Sustainable Farming Incentive — England, 52% allocated Ongoing Capital grants — allocation moves fast once open Annual Whole Farm Plan components — Scotland, phased deadlines 6 April Inheritance relief cap takes effect — UK wide